AE Long Term Timeline

From Airline Empires Wiki

Jump to: navigation, search
m (Version 3.0 (Early August))
(Version 3.1 (November 2010) Planned Features)
Line 22: Line 22:
* More labor controls (salaries, layoffs), possible strikes
* More labor controls (salaries, layoffs), possible strikes
* Payload/weight penalties, runway flexibility (depends on data collection)
* Payload/weight penalties, runway flexibility (depends on data collection)
 +
* Random events (e.g. storm shutting down entire airport(s) for 1-2 days)
== Version 3.2 (January 2011) Planned Features ==
== Version 3.2 (January 2011) Planned Features ==

Revision as of 04:22, 9 September 2010

Personal tools