AE Long Term Timeline
From Airline Empires Wiki
m (→Version 3.0 (Early August)) |
(→Version 3.1 (November 2010) Planned Features) |
||
Line 22: | Line 22: | ||
* More labor controls (salaries, layoffs), possible strikes | * More labor controls (salaries, layoffs), possible strikes | ||
* Payload/weight penalties, runway flexibility (depends on data collection) | * Payload/weight penalties, runway flexibility (depends on data collection) | ||
+ | * Random events (e.g. storm shutting down entire airport(s) for 1-2 days) | ||
== Version 3.2 (January 2011) Planned Features == | == Version 3.2 (January 2011) Planned Features == |