AE Long Term Timeline

From Airline Empires Wiki

Jump to: navigation, search
(4.0 Series (Planned))
Line 40: Line 40:
== 4.0 Series (Planned) ==
== 4.0 Series (Planned) ==
* Cargo
* Cargo
 +
* Real calendar (no more 24-day months)
* New maintenance, aircraft valuation system
* New maintenance, aircraft valuation system
* Turntime based gate capacity system
* Turntime based gate capacity system
* Standardized aircraft addons system (engines, winglets, aux fuel tanks, etc)
* Standardized aircraft addons system (engines, winglets, aux fuel tanks, etc)
<br />
<br />
 +
== 5.0 Series (Planned) ==
== 5.0 Series (Planned) ==
* Timetabling
* Timetabling

Revision as of 20:16, 19 August 2011

Personal tools