AE Long Term Timeline
From Airline Empires Wiki
(→4.0 Series (Planned)) |
|||
| Line 40: | Line 40: | ||
== 4.0 Series (Planned) == | == 4.0 Series (Planned) == | ||
* Cargo | * Cargo | ||
| + | * Real calendar (no more 24-day months) | ||
* New maintenance, aircraft valuation system | * New maintenance, aircraft valuation system | ||
* Turntime based gate capacity system | * Turntime based gate capacity system | ||
* Standardized aircraft addons system (engines, winglets, aux fuel tanks, etc) | * Standardized aircraft addons system (engines, winglets, aux fuel tanks, etc) | ||
<br /> | <br /> | ||
| + | |||
== 5.0 Series (Planned) == | == 5.0 Series (Planned) == | ||
* Timetabling | * Timetabling | ||
